Intelligent Welding Workshop for Large-Scale Excavator Structural Components
There are total 4 lines, covering production of upper frame assembly, lower frame,assembly, arm, boom and bucket.
Suitable for 65T, 75T, 90T, 100T, 125T load machineries.
Work pace: 1.2set/day
Operators needed: 56 persons
Based on 330working days/year; 2 shift/day; 11working hours/shift.
The whole workflow covering from raw material storage, cutting, fitting-up, robotic welding, manual welding &repair, aging and levelling. All the working processes are streamlined designed, logistic by AGV/RGV.
Reasonable layout planning, professional design, suitable welding process selection maximize the whole line robotic welding reach rate.