Xinxiang Tianfeng Machinery Manufacture Co Ltd

17# New One Street, High-tech Development Zone
Xinxiang City,  Henan Province  453000

China
0086-373-3526693
http://www.tfforming.com
  • Booth: A2936


 Press Releases

  • composed by uncoil-guiding-leveling& feeding-continuous punching-roll forming-measure& cutting-automatic stacker

    The rollers’ support is a whole one, all the dimensions is processed by machining center. The distance (space) between top & bottom rollers is adjusted by eccentric sleeve on the top roller shaft. The lock device ensures stability of the machine. All the bearings on the top & bottom shafts are lubricated.

  •  Composed by  uncoiling –leveling- looping—feeding—punching —roll forming—cutting –discharging

    Double cantilever gear drives, the producing width of machine is adjust continually, it is possible to change the width and height.

  • Composed by  uncoil----roll forming----saw cutting----outlet finished product

    The roll forming craft is made by the special Germany cold roll forming program COPRA; the craft is also made the FEA analysis and check. The structure of the rollers is combined, so the line speed difference and resisting force of roll forming is small. The sheet is easy to feed. All these assure the accuracy and stable of the roll forming.


 Products

  • Steel Piling Roll Forming Line
    TF piling sheet line adopts quick-change cassettes structure, which means one machine can produce 8 profiles, with the advantages of high speed and automation....
     

  • composed by  Loading coil----uncoiling---guiding—leveling---cutting&punching----conveyor---feeding---roll forming----prod

    TF piling sheet line adopts quick-change cassettes structure, which means one machine can produce 8 profiles, with the advantages of high speed and automation. The max. coil thickness: 8mm The piling sheet is very popular now. In the permanent structures, it is used in the ports, dumps, shore protection wall, retaining wall, breakwater, training dike, dock, flow gate and so on. In the temporary structures, it is used in mountain seals, temporary land expansion, flow break, bridge rail, soil block, water block and sand block when big pipes laying. It is also used in flood fighting. 

PLEASE NOTE -- Supported browsers are: Internet Explorer - 10.0 and higher; Chrome - 55.0 and higher; Firefox - 50.0 and higher; Safari - 5.0 and higher. This program does not support compatibility view to run older browser software. Please make sure you are using the most up to date browser version to ensure complete use of the website.

For Technical Support with this webpage, please contact support.